Process Improvement of Molten Zinc Plating

Process Improvement of Molten Zinc Plating

Process Improvement of Molten Zinc Plating Made in Korea

Description

The hood equipment system of the bath patented by J-E TECH was applied to capture the pollutants generated in the zinc plating process. The main features of this product is to separate the treatment bath and outside air by installing an air-blocking baffle and then prevent the pollutants from exhausting into air by creating a negative pressure inside the baffle with a burial-type hood duct.

1. Problems of the Existing Hood Molten Zinc Plating Bath Application Of the Fan-Suction Hood

- Designing without the Consideration of the Width of the Plating Bath.

- Difficult to Capture Diffused Pollutants.

- Application of Push-Pull Hood.

- Difficult to Design(Design Method based on Experience), used early in Japan.

- Difficult to Harmonize PUSH and Pull.

2.Capture Method of J-E TECH Hood of Molten Zinc Plating Bath Double-Fan Suction

- Capture Efficiency over 95%.

- Capture Efficiency of over 95%.

- Effect of Blocking Outside Air and Exclusive Capture of Pollutants.

Burial of Hood Dust

- The Problem of Damage Solved.

- Semi-Permanent.

- Maximization of Baffle Effect.

Consideration of Operations Safety

- Linkage of Baffle and Safety Guardrail.

Changes of Collection Method

- Extension of Filter Bag Longevity :2.5 times the Existing One Working Efficiency Improvement by 30%.


Product Inquiry

Your Name:
Your E-Mail:
Telephone Number:
Fax Number:
Your Country & Territory:
Address:
Subject:
Product Quantity Looking for:
Your Message:

Note: Please clealry menction the product/product names, Model, Size & other specifications that will help us to reply you as soon as possible.
Additional Details Required:
  • Minimum Order Quantity
  • Payment Terms
  • More Product Details
  • Availability / Cost
  • Shipping Details
  • Certificates
  • Expected Delivery Lead Time
Confirm Text:    captcha
 

Purchase Product Catalog

Payment & Shipping Conditions:
  • Payment: We accept payment through Paypal Only.
  • Shipping: We will ship the catalog once the payment is received. And you will be receiving the catalog with in 10 -14 busines days. Shipping might be delayed in due to international shipping conditions which is depends on the countries receiveing. In case hard copy of catalog is not available then we will ship the soft copy.
  • Refund: We can refund the order before shipping process was initiated. Incase Catalog not available, we will make sure to refund the order.
  • Note: This is a Catalog Produt.

Products Categories

Products Keywords

Share Process Improvement of Molten Zinc Plating in Social Media